Feasibility study and conceptual design for wetland restorarion within the ‘EZERANI’ NATURE PARK (PRESPA LAKE BASIN), FYR MACEDONIA.


United Nations Development Programme. Budget: 123.630,00 USD Start date: June 2013. End date: Jun 2014.

Description of the proyect: The main goals of the project are to prepare a feasibility study and a conceptual design for a wetland restoration initiative for the area within the existing boundaries of Ezerani Nature Park (ENP). The feasibility study would compare a few wetland restoration alternatives that will take into account number of assessment factors (financial, economic, environmental and social).
Various combinations of wetland restoration measures will be analyzed following the preliminary evaluation of possible options. The proposed solutions will take into consideration the limitations imposed by the land-ownership structure and will balance project goals of improving water quality in Prespa Lake and providing enhanced wetland habitat for birds and other wildlifes.

See summary file Page 2 

 

CONSULTING AND TECHNICAL ASSISTANCE FOR THE DRAFTING OF THE CONSTRUCTION PROJECT OF THE 3RD PIPE BELONGING TO THE “MANCOMUNIDAD DE AGUAS DEL SORBE” (M.A.S.) FOR WATER TRANSPORT FROM AZUQUECA 3 JUNCTION TO THE NEW RESERVOIR TANKS IN ALCALÁ DE HENARES (MADRID).


ACUAES Sociedad de Aguas de las Cuencas de España S.A.. Budget: 57.417,00 € Start date: July 2013. End date: December 2013

Description of the proyect: Development of the project for the construction of a high pressure pipeline, for water supply transporting, with diameters from 1.200 to 900 mm and 15 Km long. The installation to be designed includes valves, electromechanical equipments, telecomunications and energy devices, for remote monitoring and remote control of the system. The specific surveys developed are new mapping generation, on-site testing and geotechnical study, hydraulic calculation for steady and non-steady flow, mechanical and structural calculation, definition of construction system for microtunnels, expropriating lands, infrastructures and affected services, environmental assessment analisys and the survey for safety and health working.

See summary file Page 2 

 

Environmental impact assessment of the Project for the Integration of Tajo river in Toledo city.


Burgos & Garrido Arquitectos S.L.P.. Budget: 66210,98 €. Start date: May 2013. End date: November 2013.

Description of the proyect: The Environmental Impact Study (EIS) focuses on the space affected by the exploitation of the Project for the Integration of Tajo river in Toledo city. The EIS aims to study and evaluate those actions that could be harmful to the environment, establishing corrective and protective actions in order to ensure the maintenance of the initial conditions. According to national and regional legislation, the EIS includes the following information: Compilation of core environmental indicators (environmental study). Analysis of those possible impacts that the action may have on environmental elements (identification and evaluation of impacts). Study of the applicable corrective measures to eliminate or mitigate impacts.

See summary file Page 2 

 

Master Plan for Restoration and Improvement of the Aquatic Ecosystems of the Basque Country.


Basque Water Agency - Environmental and Territorial Policy Department . Basque Government. Budget: 117.944,75 €. Start date: February 2013. End date February 2015.

Description of the project: The works covered by the contract, considering different phases, have been grouped into the following tasks: Collection and evaluation of basic information, Diagnosis of the situation, Establishment of goals and development of action strategies, Definition of measures and actions in the Master Plan, Realisation of public participation processes and Technical support in the administrative processing of the Master Plan, including the Strategic Environmental Assessment.

See summary file Page 2 

 

Services for the study of the monitoring and implementation in Spain of  Directive 91/271/EEC and of the actions contained in the national plan for water quality.


General Directorate of Water. Ministry of Environment, and Rural and Marine Affairs. Budget: 770.802,24 € Start date: December 2011. End date: December 2012.

Description of the project: The study was conducted by monitoring the status of wastewater treatment systems in terms of the level of infrastructure achieved and the control of wastewater treatment plants (WWTPs) undertaken. The information of urban agglomerations, WWTPs, discharge points and sensitive areas affected by the Directive has been updated in collaboration with all Autonomous Communities. A reply was sent to respond to the ongoing penalty procedures and to the inquiries of the European Commission.

See summary file Page 2 

 

Feasibility study for the implementation of and Hydrological and Water Quality Information Integrated System in the lake Skadar Basin (Montenegro).


Ministry of Sustainable Development and Turism (Department of Environmente), Government of Montenegro. Budget: € 334,000. Start date: November 2012. End date: June 2013.

Description of the project: The work focuses on the assessment and analysis of technical feasibility of the implementation of and Hydrological and Water Quality Information Integrated System (HWQIIS) able to provide basic hydrological information including the following objectives:
- Hydrographic and hydrodinamic characteritation of the lake Skadar basin in order to assess the technical adequacy of the implementation and commissioning of infraestructure associated with a HWQIIS .
- Definition and characterization of basic infrastructure implemented in the Montenegrin basins and its relevance to the technical requirements for the implementation, commissioning and operation of a HWQIIS in the Lake Skadar basin.
- Identification, evaluation and selection of compatible technological alternatives.
- For the selected alternative, definition of the basic and functional features of the Lake Skadar HWQIIS applicable to the whole of the river network.

See summary file Page 2 

 

Consulting and technical assistance for Bregalnica River Basin Management Proyect. Macedonia.


Ministry of Environment and Physical Planing, Macedonia. Budget: € 350,000. Start date: July 2012. End date: March 2013.

Description of the project: Institutional development aiming at the establishment organization and sucessful operation of the Bregalnica River Basin Management Body and River Basin Management Advisory Council as a showcase for other river basins in the country. Policy dialogue aiming at facilitating ther reform process related to the EU Water Directive. Planning and implementation of small water infrastructure projects, through municipalities and public utilities fron the region.

See summary file Page 2 

 

Elaboration of the regional sanitation plans of Huancavelica and Ayacucho (Perú).


Ministry of Housing, Construction and Sanitation. Government of Peru, and Inter-American Development Bank. Budget: € 260,620.74. Start date: August 2012. End date: April 2013.

Description of the project: Preparation of the Regional Plan for Sanitation of Hauncavelica Region and Ayacucho Region. Situational diagnosis of the integral sanitation in each region. Definition of medium and long term perspective.  Investment and financing programming. Organization to implement the Plan. Organization and development workshops.

See summary file Page 2  Page3

 

Service for the completion of a Bioindicators Based Study on the development of tools and methodologies for evaluating the ecological status of river Guadiana in Extremadura. RICOVER Project, INTERREG IV B SUDOE Programme.


Directorate-General for Environment. Department of Agriculture, Rural Development, Environment and Energy. Regional Government of Extremadura. Budget: € 71,990.86. Start date: September 2010. End date: June 2011.

Description of the project: Literature review of existing indicators. Applicability in places with similar climatic and hydrological characteristics. Proposal of new indicators based on past experiences and historical analytical results. Selection of river sections. Analytical study of historical records and selection of a sample of 9 sections, representing the study area. Proposal of indicators to evaluate, selection of sampling points and schedule. Definition of objectives, parameters and aspects to be evaluated, selection of parameters (temperature, O2, pH, EC, NH4, NO3, PT, IHF, QBR, RQI, RFV, IBMWP, IPS, Ichthyofauna), coordination with stakeholders and establishment of sampling programme. Sampling campaigns. Reference standards to be applied, sampling according to the schedule and the selected methodology: fall campaign (November 2012) and spring campaign (May 2011). Analysis of results. Drafting of the Ecological Characterization Final Report. Interpretation of sampling results, proposal of indicators and conclusions.

See summary file Page 2

 

Study of ecological restoration solutions in three priority river sections in the Tajo River Basin.


Tajo Hydrographic Confederation. General Directorate of Water. Ministry of Environment and Rural and Marine Affairs. Budget: € 69,342.55. Start date: March 2011. End date: March 2012.

Description of the project: Collection and analysis of background on the environmental status of rivers under study. Field work and selection of river sections. The diagnosis of the river status is verified on the ground, the problems are located and the areas of action are defined for achieving the marked objectives. Study of solutions. Technical, economic and environmental criteria are applied to the analysis of the alternatives of action. Preparation of technical projects, which reflect the objectives and rationale of the project, the analysis of the problem of the river section and conveniently justifies the actions: Ecological Enhancement Project of river Tiétar upstream of the Rosarito Reservoir. Miscellaneous municipalities (Avila and Toledo). Project for the Decommissioning of the Robledo-Toma Reservoir on the river Cofio. Municipalities of Santa Maria de la Alameda (Madrid) and Las Navas del Marques (Avila). Project for the Decommissioning of the Robledo de Chavela Reservoir on the river Cofio. Miscellaneous municipalities (Madrid).

See summary file Page 2

 

Consulting and technical assistance for flood study and definition of the hydraulic public domain of the rivers Carrión, Ucieza, Valdeginate and Retortillo. Duero River Basin District.


Duero Hydrographic Confederation. General Directorate of Water. Ministry of Environment and Rural and Marine Affairs.. Budget: € 1,266,136.50. Start date: November 2007. End date: December 2009.

Description of the project: Mapping (LIDAR laser altimetry) and true orthophotography tasks, preparation of a Digital Terrain Model, Cross Sections (topographic-bathymetric), infrastructure inventory and characterization, hydrological, hydraulic, geomorphological, environmental and property surveys, demarcation for Public Water Resources, easement and monitoring areas, demarcation of flood zones in different return periods, identification of risk areas, reporting and communication to the relevant authorities and bodies. Integration of information in the Corporate GIS and design and completion of an associated database.

See summary file Page 2 Page 3

 

Consulting and technical assistance for monitoring and study of the implementation of Directive 91/271/EEC in Spain


General Directorate of Water. Ministry of Environment and Rural and Marine Affairs.. Budget: € 1,196,873.90 . Start date: September 2007. End date: August 2011.

Description of the project: Review of existing information and updating the inventory of WWTPs for the first three implementation phases of the Directive (1998-2005). Listing and analysis of towns affected by the last implementation phase of the Directive. Collection and extension, based on existing analytical data, of supplementary studies in relation to the implementation and monitoring of the Directive. Diagnosis of collecting systems and treatment plants at all towns affected by the directive. Association with other Community Directives. Review and study of investments made since the adoption of National Sewage and Treatment Plan approved in 1995. Evolution of the said plan, monitoring and control of actions pending execution. Compliance with the Plan by the Autonomous Regions. Analysis of directive 91/271CEE information handled by the European Commission and monitoring of newly declared Inter and Intra-community sensitive zones. Analysis of the global situation both concerning sludge from WWTPs and reused water. Status of biodegradable wastewater discharges by the food industry. Preparation of graphic, written or computerised documents to be submitted to the European Commission in relation to the new 2007 Questionnaire.

See summary file Page 2

 

Support to the national strategy for river restoration in the Tajo River Basin District.


Tajo Hydrographic Confederation. General Directorate of Water. Ministry of Environment and Rural and Marine Affairs. Budget: € 969,866.00. Start date: March 2008. End date: March 2010.

Description of the project: Identification of sections with hydrological environmental problems, assessment of their environmental state, determination of reference image, design of the image object of the project, technical report and environmental processing, preparation of background studies, analysis of alternatives, calculations and designs, participation, information and public dissemination processes, drafting of the ten (10) construction projects, advice on restoration, conservation and volunteer actions already underway, first proposal of river reserves and organization of a training day.

See summary file Page 2

 

Consulting and technical assistance for the surveillance network of the state of pollution by priority substances in the rivers of the Basque Country Autonomous Community.


Water Board. Department of Planning and Environment. Basque Government. Budget: € 425,000. Start date: December 2003. End date: December 2007.

Description of the project: Data collection and analysis. Control network design and campaign planning. Selection of parameters by sampling matrix and point. Establishing quality standards and "stand still" levels. Sampling and analysis in the water column. Sediment sampling and analysis. Biota sampling and analysis. Interpretation of results. Assessment of the chemical state. Interrelationship between results and sources of contamination. Database updating. Drafting of annual reports on the chemical state by hydrological units.

See summary file Page 2

 

Consulting and technical assistance for the study of impacts of human activity in the state of surface water. Further characterization of risk, particularly of water bodies at risk under study in the Guadiana River Basin District.


Directorate General of Water. Ministry of Environment and Rural and Marine Affairs. Budget: € 353,043.52. Start date: January 2008. End date: June 2009.

Description of the project: Identification of deficiencies and adaptation of the results of the first pressure and impact study to new water bodies; updating and verification of pressures, impact assessment and risk assessment of non- compliance with environmental objectives, updating the DATAGUA database, preparation of information to exchange with Portugal and proposed Public Water Resources management measures.

See summary file Page 2

 

Consulting and technical assistance for the study of human activity in the state of surface waters, identification of pressure, impact assessment and location of potential reference sites in the Tajo River Basin District.


Secretary General for Territory and Biodiversity. General Directorate of Water. Environment Ministry. Budget: € 255,000. Start date: July 2004. End date: July 2005.

Description of the project: Identification of significant pressures originating from the point or diffuse pollution, regulation or extraction of circulating flows, and morphological changes of the riverbed and banks, determining the existence of proven or probable impacts on water quality and the current flow regime, qualitative assessment on the level of certainty of the risk of not achieving environmental targets required by the Public Water Resources, quantitative assessment of the high, medium or low risk of non-compliance with the above-mentioned objectives, proposal for potential reference sites for water bodies of each defined ecotype, preparation of all information in databases and geo-referenced layers according to the formats of the General Office of Integrated Public Water Management, as well as reports required by the European Commission.

See summary file Page 2

 

Consulting and technical assistance for the realisation of a river restoration action plan in the province of Bizkaia (Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 169,000. Start date: September 2004. End date: June 2005.

Description of the project: Analysis of the environmental hydrological situation, selection and grouping of sections, analysis of alternatives, proposal and prioritization of actions, cost estimates, study of conditioning elements and actors involved, implementation schedule, investment plan, monitoring and control plan, and preparing five (5) standard draft projects.

See summary file Page 2

 

consulting and technical assistance for the realization of the economic analysis, according to the Water Framework Directive, on the Guadiana River Basin District.


Guadiana Hydrographic Confederation. General Directorate of Water. Ministry of Environment. Budget: € 200,000. Start date: June 2005. End date: June 2006.

Description of the project: Assessment of the socio-economic importance of the current usage of water (Identification of usage and services of socio-economic sectors, Fixing potential significance indicators, Assessment of the importance of usage, Identification of species protection areas), Forecast of the trend of key indicators to the year 2015 (Socioeconomic trends, Identification of legislative measures and proposals, Forecast of changes in strains due to economic factors, Development of strain scenarios, Sensitivity analysis), Assessment of the current recovery of costs (Identification and estimation of environmental costs and resource costs, Study on prices and tariffs paid by users, Identification of cost recovery mechanisms, Calculation of the rate of cost recovery in key sectors, Revision of the incentives for current rates), Preparation of the documentation required to report to the European Commission.

See summary file Page 2

 

Consulting and technical assistance for the study of the wastewater treatment for the pyrenean urban agglomerations located in the river alto Aragon and redaction of pre-projects of sewerage and wastewater treatment plants. municipalities of Canfranc, Astún and Candanchú (Aragon Autonomous Community).


Ebro Hydrographic Confederation. General Directorate of Water. Ministry of Environment. Budget: € 204,016.03. Start date: July 2005. End date: July 2008.

Description of the project: Hydrological studies, Characterization of discharges, Topographic and cartographic work, Geological and geotechnical studies, Defining location of hubs and number of WWTPs to be built, Study of WWTPs, Expansion of geological and geotechnical studies, Determination of flooding patterns, Environmental Impact Study, Expropriations, Preparing draft projects.

See summary file Page 2

 

“Consulting and technical assistance for elaboration and processing of The Director Plan of Sewerage in Balearic Islands.


Balear Water and Environmental Quality Agency. Budget: € 163,884.83. Start date: June 2008. End date: December 2010.
Description of work: prepare and process the PDSS in the Balearic Islands in order to provide a planning tool for sanitation, treatment and reuse of public sanitation facilities in the Balearic Islands, establishing the general criteria required to define the actions and activities that will achieve the objectives of the PDSS. Diagnose the current situation. Constraints and objectives. Actions and proceedings. Economic-financial study.
See summary file Page 2
 

Consulting and technical assistance for the elaboration, in the river basin Guadiana, of various studies under the Directive 2000/60/CE. Phase I-Pressures .


Guadiana Hydrographic Confederation. General Directorate of Water. Ministry of Environment. Budget: € 168.911,12. Start date: October 2004. End date: June 2005.

Description of the project: Classification, identification, demarcation and classification of water bodies, identification, demarcation and classification of protected water bodies, classification, identification and characterization of the pressures of human activities on water bodies, assessment of the impact supported by each body of water, determining the risk of failure to meet targets required by the Directive, economic characterization of water uses, development of the Register of protected water bodies, identification of undisturbed or minimally disturbed water bodies that could serve to establish a referral network, identification and proposal of heavily modified water bodies where less stringent environmental objectives can be demanded, completion of forms and reports to deliver to the European Commission.

See summary file Page 2

 

Consulting and support services for the elaboration of monitoring reports of drought and flood episodes.


General Directorate of Water. Ministry of Environment and Rural and Marine Affairs. Budget: € 178,040.95. Start date: November 2009. End date: November 2011.

Description of the project: Preparation of weekly drought and flood monitoring reports by river basin. Preparation of quarterly drought and flood monitoring summaries. Preparation of an annual hydrological balance report.

See summary file
Page 2
 

Consulting and technical assistance for the preparation of the integrated environmental authorisations for brick manufacturing industries, according to IPPC Directive and Spanish Law 16/2002.


Grupo Díaz Redondo. Budget: € 36,037.00. Start date: July 2004. End date: December 2004.

Description of the project: For installations of the ceramic company, HDR S.A.: assumed substantial change study; preparation of IAA application: blueprint for the installation, hydrogeological study, non-technical summary and attached summary; submitting the application and monitoring the IAA process. For installations of the ceramic company, Industrias Cerámicas Díaz S.A.: preparation of IAA application (blueprint for the installation, hydrogeological study, non-technical summary and attached summary); submitting the application and monitoring the IAA process; processing Discharge Authorisations.

See summary file
Page 2
 

Consulting and technical assistance for the development of a guide to prevent the sewage sludge pollution from industrial activities.


General Secretariat for pollution prevention and climate change. General Directorate of Quality and Environmental Assessment. Ministry of Environment. Budget: € 30,000. Start date: July 2004. End date: November 2004.

Description of the project: Identification of the various processes that generate pollutants, as defined in the 3rd draft Sludge Directive, which can reach Urban Waste Water Treatment Plants and, therefore, the treatment sludge. Definition of action programmes and measures to reduce pollution in industrial effluents. Defining actions to set-up a basic urban networks distribution system. Definition of training activities for industry players to promote BAT. Joint implementation measures at local level.

See summary file Page 2

 

Consulting and technical assistance for the analysis of the implementation of the CAIB of the obligations of The National Sanitation and Treatment Plan (1995-2005) and proposed actions to be considered in The New National Plan for Water Quality, Sanitation and Purification 2006-2015.


Balear Water and Environmental Quality Agency. Budget: € 29,900. Start date: March 2007. End date: July 2007.

Description of the project: Analysis of compliance by the General State Administration and by the Autonomous Region of the Balearic Islands of the Bilateral Agreement signed between the two as a result of the National Water Treatment Plan 1995-2005. Study assessing the pollution load and the number of urban agglomerations between 1995-2005. Analysis of financing and infrastructure works undertaken in the period 1995-2005. Comparison of planning and financing tools with other autonomous regions.

See summary file Page 2

 

Restoration projects on the rivers Butroe, Galindo, Gobelas, Lea, Barbadun and Artibai (Bizkaia Province, Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 112,697.44. Start date: December 2005. End date: May 2006.

Description of the project: Mapping and surveying tasks, review of flood water studies, geological studies and materials analysis, urban planning, environmental analysis, design and dimensioning of technical solutions, analysis and environmental assessment of alternatives, structural calculations, construction procedures, replacement of easements and services concerned, expropriations, price justification, health and safety studies and environmental impact studies.

See summary file Page 2

 

Restoration of river Estepona in the municipality of Bakio (Bizkaia Province, Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 12,000. Start date: May 2005. End date: August 2005.

Description of the project: Drafting of the Report and Annexes, Plans, Budget, and Special Technical Specifications.

See summary file Page 2

 

Engineering services for the identification of alternatives for the maintenance and operation of the hydrological information automatic system (HIAS) in Tinto, Odiel and Piedras River Basin Districts (Huelva Province) and Guadalete-Barbate River Basin District (Cadiz Province).


General Directorate of the Andalusian Atlantic River Basin. Department of Environment. Andalusian Regional Government. Budget: € 20,000. Start date: September 2009. End date: December 2009.

Description of the project: The project consists in describing and analysing the communications system infrastructure and operating systems connected to the existing Automatic Hydrological Information Systems in the Andalusia Atlantic Basin for the Guadiana and Guadalquivir River Basins to enable the joint maintenance and operation by the new basin agency. The different alternatives and their compatibility with the new regulations and requirements established in Law 30/2007 on public sector contracts have to be studied and assessed.

See summary file Page 2

 

Consulting and Assitance for study for the scatter index evaluation and proposal of supra-municipal systems in commonwealths of municipalities in the Autonomous Community of Andalusia.


Andalusian Water Agency. Regional Ministry of Environment. The Regional Government of Andalusia (Spain). Budget: € 20,877.59. Start date: January 2009. End date: February 2009.

Description of the project: The purpose of this study is to identify the consolidation stage of supra-municipal systems in the Integrated Water Cycle management. To assess this consolidation it was necessary to calculate a scatter index and calibrate the costs of implementing them. It was also investigated the existing Commonwealths of Municipalities in other subjects, different to Integrated Water Cycle, in the supra-municipal systems that are currently unstructured. In this way, it was possible to study the feasibility to add them to existing water services in the Commonwealths. Another object of this study, offer training to Commonwealths on unstructured areas and provide an overview of the Decree 310/2003 implementation, in the Autonomous Community of Andalusia.

See summary file Page 2

 

Action plan in water supply and drafting of documentation required for the tender procedure of final desing and works that were considered as necessary and priority in the province of Córdoba. Block III.


Andalusian Water Agency. Regional Ministry of Environment. The Regional Government of Andalusia (Spain). Budget: € 602,343.52. Start date: July 2009. End date: April 2010.

Description of the project: This project scope is developing the action plan to be taken in the water supply infrastructure in the province of Cordoba, from an own and updated diagnosis of the situation. Through this action plan, performances are ordered and defined in time according to the requirements of the Public Administration. Actions can be defined by a preliminary draft project, a construction project or by a feasibility study. Furthermore, within the document, are been drafted General and Specific Regulations, of actions identified in the program, for the construction project and works competition that are tendered by the Andalusian Water Agency.

See summary file Page 2

 

Control and surveillance of sewerage systems´ works in the Doñana national park sorroundings (Phase III). Seville (Spain).


Guadalquivir Hydrographic Confederation. Ministry of Environment. Budget: € 253,774.95 Start date: May 2010. End date: November 2011.

Description of the project: The services for this contract are based in a project that define the partial replacement of exiting sewerage systems and water supplies in different municipalities of Seville (Spain): Albaida, Gerena, Villamanrique and Aznalcollar. This project also include the implementation of intrusion alarm systems in several water treatment or storage installations. Such is the case of sewage and water treatment plants and reservoirs dispersed by Aljarafe area in Seville province. AMBISAT function in this contract is to control and monitor these works, check the quantities measurement for pay purposes and policy the correct execution in accordance with the document that defined them.

See summary file Page 2

 

Engineering services for the functional extension of the National Drought Observatory website.


Sub-Directorate General For Planning and Sustainable Use of Water. General Directorate of Water (Ministry of Environment and Rural and Marine Affairs). Budget: € 70,529.54. Start date: July 2010. . End date: January 2011.

Description of the project: The National Drought Observatory (ONS) was established in 2005 as a joint initiative of the former Ministries of Environment and Agriculture, Fisheries and Food, which sought to bring together all the Spanish water authorities, in order to establish a Centre of knowledge, anticipation, mitigation and monitoring of the effects of drought in the national territory. Five years after the publication of the ONS website, this project has allowed modifying and extending its functionality; in addition to all the information that, through this website, is provided to users.

See summary file Page 2

 

Consulting and technical assistance for the elaboration, in the river basin Guadiana, of the pressures and impacts studies.


Guadiana Hydrographic Confederation. General Directorate of Water. Ministry of Environment. Budget: € 28,525.92. Start date: August 2004. End date: February 2005.

Description of the project: Article 5 of the Water Frame Directive (WFD) requires each river basin district to make a study of the impact of human activity in the state of surface waters in accordance with the technical specifications set out in Annex II of the Directive. This study consists in identifying the significant pressures being put on each surface water body, in order to determine the probability of failure to meet environmental objectives set for them in Article 4 of this WFD.

See summary file Page 2

 

Consulting and assistance for information collecting to economic analysis in accordance with EU Water Framework Directive ( 2000/60/EC).


Guadiana Hydrographic Confederation. General Directorate of Water. Ministry of Environment. Budget: € 28.496,63. Start date: August 2004. End date: February 2005.

Description of the project: The work involved in conducting studies relevant to Article 5 of the Water Framework Directive, in terms of socio-economic characterization of water uses, and current status of the impact of their associated services costs (Article 9 of the WFD), which allow a further detailed study of the most cost effective combination of measures, the use of water should be included in the Programme of Measures (Article 11 of the DMA) considering the estimated costs of these measures potential (Annex III). Also enable the designation of heavily modified water bodies, reporting and communication to the European Commission of the exceptions and exemptions in the DMA objectives.

See summary file Page 2

 

River Oka restoration project in the municipalities of Gernika and Ajangiz (Bizkaia Province, Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 18,000.00. Start date: December 2009. End date: September 2010.

Description of the project: The restoration of the river bed and banks of the River Oka and the enhancement of cultural and scenic features are among the priority actions set out in the River Restoration Action Plan for Biscay. The River Oka across the municipalities of Gernika and Ajangiz presents an acceptable state along almost all its length, except for some sections with erosion phenomena in the river bed and banks. Other impacts identified in the river environment are the location of solid waste in the river banks and the remains of old weirs in the river bed. The project defines the works required to achieve the following objectives: Stabilizing the slopes of the river banks with bioengineering. Recovering the longitudinal river continuity eliminating obstacles in the river bed. Increasing the lateral connectivity of the channel with its banks and flood plain. Improving vertical connectivity of the channel by removing the waste.

See summary file Page 2

 

Hydraulic study and actions in the river Udondo. (Bizkaia Province, Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 17,986.55. Start date: January 2009. End date: June 2009.

Description of the project: The major floods that occurred in June 2008 in the River Udondo valley raised the need to find out the causes of them. Through a hydrologic and hydraulic study, the conflictive points that block the flow of water are identified. Problems are detected in two drainage structures and it is also perceived that the final stretch of the study suffers a bottleneck that causes a accumulation of excess water. Actions necessary to minimize disruption of water flow are defined and budgeted.

See summary file Page 2

 

Feasibility study for Sopuerta wastewater treatment plant. (Bizkaia Province, Basque Autonomous Region).


Department of Environment. Foral Council of Biscay. Budget: € 17,953.48. Start date: September 2008. End date: March 2009.

Description of the project: The feasibility study is linked to the document "Projects for the new construction and improvement of the sewerage systems in Las Encartaciones county. Sopuerta-Galdames", for it is planned that the collection network will end in the Sopuerta WWTP. The object of this work is to perform a predimensioning of the WWTP in order to estimate the surface occupation necessary for the facility, and thus being able to determine the most appropriate location.

See summary file Page 2

 

Design of wastewater treatment processes and equipment selection and auxiliary means at Gran Canaria airport. (Floating Macrophyte Filter),


INECO. Budget: € 15,800.00. Start date: October 2005. End date: March 2006.

Description of the project: The alternatives of the different processes to develope for the appropriate waste water treatment of the Gran Canaria Airport have been simplified in a few treatments, given the need condition to incorporate a floating macrophyte filter process (FMF) and given the population equivalent limit to treat and also the characterization of parametric values of pollution including in the effluent.

See summary file Page 2

 

Proposals for river Guadalete recovery strategy passing through Jerez de la Frontera (Cádiz).


Andalusian Water Agency. Regional Ministry of Environment. The Regional Government of Andalusia (Spain). Budget: € 12,000.00. Start date: January 2008. End date: April 2008.

Description of the project: The study aims to reflect the principles that lead to the approach of the river Guadalete recovery strategy passing through Jerez de la Frontera and the main directions of real and effective translating them.

See summary file Page 2

 

Environmental impact assessment of the project “Clay quarry for brick manufacturing in the municipality of Villaluenga de la Sagra (Toledo Province, Castilla-la Mancha Autonomous Community).


Grupo Díaz Redondo. Budget: € 5,500.00. Start date: July 2005. End date: September 2005.

Description of the project: The Environmental Impact Study (EIS) focuses on the space affected by the exploitation of the clay quarry "Marisa" in the municipality of Villaluenga de la Sagra (Toledo). The EIS aims to study and evaluate those actions that could be harmful to the environment, establishing corrective and protective actions in order to ensure the maintenance of the initial conditions. According to national and regional legislation, the EIS includes the following information: Compilation of core environmental indicators (environmental study). Analysis of those possible impacts that the action may have on environmental elements (identification and evaluation of impacts). Study of the applicable corrective measures to eliminate or mitigate impacts.